Ilandag SA
FROM ILANDAG SA TO MINERA GROUP
The road that began in 1996 outgrew its own boundaries over time.
As Ilandag SA grew over the years, its experience, geography, project scale and goals grew with it. An activity that started in one direction turned into a large system bringing together various fields.
There came a time when the existing name was no longer enough to express this scale.
And so *Minera Group* was born, uniting 30 years of experience, everything that was built and a vision for the future under one identity.
This is not just a change of name. It is a new step from the past to the future, a new expression of strength built over the years.
**Ilandag SA was the beginning of a road. Minera Group is the new era of that road.**
30 YEARS | 1996–2026
Starting in 1996, Minera Group's path of development today brings together 30 years of experience, broad areas of activity and professional teams across various directions.
Under the leadership of Khudagulu Ahad oglu Rzayev, the company has expanded its scale over the years, gained important experience in construction and infrastructure, created new directions and grown into a diversified group of companies.
Today Minera Group works in building residential complexes and private houses, delivering large infrastructure projects, road and tunnel construction, construction and repair works, architecture and design services, building materials production, education and consulting.
A single approach that brings different directions together allows Minera Group to offer broad capabilities from a project's idea to its implementation.
Timeline of Our Projects
Important projects and achievements on our 30-year path of development.
1996
Laying the Foundation
An activity that started from one container with a team of 4.
1997
Ziya Bunyadov Avenue
Construction of an office building
2007
Construction of Molla Juma and Hasan Aliyev streets
Opened in 2007 with the participation of the President of the Republic of Azerbaijan, Mr. Ilham Aliyev.
2007-2008
NAP Narimanov district building
Built in 2007-2008 and opened with the participation of Ali Ahmadov, First Deputy Chairman of NAP.
2008
Memorial complex built in memory of those who died in 1941-1945
Built in 2008. Opened with the participation of the ambassadors of Russia, Ukraine, Belarus and other former Soviet Republics, and Azerbaijani war veterans.
2008
Zarifa Aliyeva kindergarten
Reconstruction and repair works began in 2008, and it was opened in 2009 with the participation of Mrs. Mehriban Aliyeva, President of the Heydar Aliyev Foundation.
2008
Republican Children's Psychoneurological Hospital
Construction of the building began in 2008, and it was opened in 2009 with the participation of the President of the Republic of Azerbaijan, Mr. Ilham Aliyev, and his wife Mehriban Aliyeva.
2009
Strengthening and refacing of the residential building at 3 Lermontov Street – 2009.
2010-2011
Major repair and restoration of the Kaspian residential buildings at 81, 83, 85 F. Khoyski Street – 2010 - 2011.
2010
Evrika Lyceum
Raising the leaders of tomorrow for 15 years now.
2012
Vocational School No. 14, Alat settlement, Garadagh district
School construction and major renovation – 2012.
2012-2013
Structural strengthening and facade rework of the 9-storey residential building at Fuzuli-53.
2012-2013
Winter Park, underground car park and park on Fuzuli Street. - Opened in 2013 with the participation of the President of the Republic of Azerbaijan, Mr. Ilham Aliyev.
2020-2021
Construction of a 1,512-pupil school building in a new residential quarter for 1,890 internally displaced families in Absheron district.
Opened in 2020 with the participation of the President of the Republic of Azerbaijan, Mr. Ilham Aliyev.
2017-2018
Construction works and the Railway Overpass at the Absheron Logistics Center
Opened in 2018 with the participation of the President of the Republic of Azerbaijan, Mr. Ilham Aliyev.
2017–2020
1.2 ha - 5 buildingsAzadlig Garden Houses
A reliable address for modern living. Located at 37 Mohsun Sanani Street, the complex was commissioned in line with modern urban planning standards.
16-storey buildings with a closed courtyard, plenty of greenery and both underground and surface parking offer residents a high level of comfort.
2017-2021
2.2 ha - 8 buildingsZümrüd Residence
A blend of classic style and comfort. With turquoise roofs and elegant facade elements, it adds special value to the architectural landscape.
The complex's infrastructure includes a landscaped courtyard, relaxation gazebos and safe pedestrian zones.
2019-2021
Construction of a 1,200-pupil school building in a new residential quarter for 1,512 internally displaced families in Ramana settlement
Opened in 2021 with the participation of the President of the Republic of Azerbaijan, Mr. Ilham Aliyev.
2020-2021
Construction of a 624-pupil school building in a new residential quarter for 810 internally displaced families in Khojasan settlement, Binagadi district
Opened in 2021 with the participation of the President of the Republic of Azerbaijan, Mr. Ilham Aliyev.
2020-2023
4.5 ha - 3 buildingsLake City
Located near Koroglu metro station, Lake City turned a place that had been an industrial zone for years into a new residential concept.
The architectural balance between the city and the lake, wide open spaces and areas integrated with greenery made it not just a complex, but a new model of life.
2021-2026
Baku Gardens
Luxury living in the city center. Located at the intersection of Yahya Bakuvi and Koroglu Rahimov streets, close to key infrastructure.
Built with durable construction technologies, the 18-storey buildings bring new-generation standards with a closed courtyard concept.
2022-2028
Mayak Residence
A premium living standard. The only residential complex 12 minutes from the city center with both lake and sea views.
The 59-block mega project covers nearly 30 hectares. With its 21-hectare park, it promises residents a life surrounded by greenery.
2023-2028
3.6 ha - 11 buildingsBaku Houses
Innovative architecture. With its distinctive facade design and open green terraces, it brings a fresh breath to the city's architecture.
The spacious enclosed courtyard features a basketball court, children's areas and rich landscaping.
2026-2029
Luna Garden
Built to meet the demands of modern city life, this project brings architectural aesthetics, comfort and functionality together in a single concept. A thoughtfully designed architectural style, a modern façade and spacious green areas give the project a distinctive character and aim to make it one of the city's standout places.
The landscaping and landscape design around the project are intended to let residents spend time in a comfortable, pleasant environment without leaving the city's dynamic life behind. The harmony between living spaces and social zones is designed to make everyday life more comfortable, attractive and functional.
Taking on a distinctive look in the evening thanks to special lighting, the residential complex reflects the elegance of modern architecture and the energy of city life. In every architectural detail, alongside aesthetics, the idea of creating a comfortable living environment comes to the fore.
2022-2027
Baku Business Center
Some places are not just built — they leave their mark on the city's future.
Standing out with its distinctive architectural style, flowing lines and the modern look created by its glass façades, this non-residential project brings a new perspective to the urban space. The union of elegant design and functionality gives business activity here a different atmosphere.
Wide shop windows, an attractive exterior and a well-thought-out spatial layout give the commercial areas a modern character. Every detail of the project, besides its visual appeal, serves to create an environment that adapts to the city's dynamic life.